c-m-p gmbH expansion includes new manufacturing facility
A second office building and second manufacturing hall will be added to the prepreg manufacturer’s Heinsberg-Oberbruch location in response to business growth.
Prepreg manufacturer c-m-p GmbH (Heinsberg, Germany) announced June 5 the company will expand its offices and manufacturing facilities. The expansion is in response to business growth in the first two quarters of 2018 and in July 2018.
A second office building will be added to the company’s Heinsberg-Oberbruch location and a second manufacturing hall is expected to be completed by August 2018, increasing the production, storage and laboratory space from 1800 m² to 3900 m². Installation of a new prepreg system is scheduled for October of 2018.
The new CP201 system enables curing at low temperatures and is temperature-resistant up to 190°C. According to c-m-p GmbH, manufacturing using the new prepreg system is expected to start in November 2018.
Related Content
-
Sulapac introduces Sulapac Flow 1.7 to replace PLA, ABS and PP in FDM, FGF
Available as filament and granules for extrusion, new wood composite matches properties yet is compostable, eliminates microplastics and reduces carbon footprint.
-
Infinite Composites: Type V tanks for space, hydrogen, automotive and more
After a decade of proving its linerless, weight-saving composite tanks with NASA and more than 30 aerospace companies, this CryoSphere pioneer is scaling for growth in commercial space and sustainable transportation on Earth.
-
Bladder-assisted compression molding derivative produces complex, autoclave-quality automotive parts
HP Composites’ AirPower technology enables high-rate CFRP roof production with 50% energy savings for the Maserati MC20.