Rocket Lab confirms new launch window for "It's Business Time" mission
The mission’s 14-day launch window will open from June 23 to July 6 at Rocket Lab Launch Complex 1 in New Zealand.
Rocket Lab founder and CEO Peter Beck says the addition of new payloads to the mission manifest highlights Rocket Lab’s ability to respond rapidly to customer demand in an ever-evolving small satellite market.
“Small satellites are playing an increasingly important role in providing crucial services that benefit millions of people on Earth,” he says. “Frequent access to orbit is the key to unlocking the potential for these satellites.”
Related Content
-
Industrializing additive manufacturing in the defense/aerospace sector
GA-ASI demonstrates a path forward for the use of additive technologies for composite tooling, flight-qualified parts.
-
Plant tour: Aernnova Composites, Toledo and Illescas, Spain
RTM and ATL/AFP high-rate production sites feature this composites and engineering leader’s continued push for excellence and innovation for future airframes.
-
Combining multifunctional thermoplastic composites, additive manufacturing for next-gen airframe structures
The DOMMINIO project combines AFP with 3D printed gyroid cores, embedded SHM sensors and smart materials for induction-driven disassembly of parts at end of life.