The Gill Corp. is awarded Boeing contract extension
Initial 2014 Tier 1 contract with Boeing has been extended to include composite floor panel fabrication for the 777, 777X and 787 programs.
Floor panel assemblies. Photo Credit: The Gill Corp.
The Gill Corp. (TGC, El Monte, Calif., U.S.) has been awarded a production contract extension with (Chicago, Ill., U.S.) to supply fabricated floor panel assemblies for the Boeing 777, 777X and 787 programs.
The company provides the “drop-in ready” kitted shipsets directly to Boeing. TGC was initially awarded the Tier 1 contract for the 787 program in 2014, followed by fabrication contracts for the 777 and 777X programs, all of which used TGC’s lightweight, high-performance composite sandwich panels. TGC supplies the sandwich panel materials for the Boeing 737 and 767 programs, along with honeycomb core, machined core details, honeycomb bonded assemblies, cargo liner laminates and sandwich panels to Boeing’s global supply chain for almost every commercial and military program.
“I would like to thank our TGC staff for their efforts towards extending the contract award,” TGC’s chairman and CEO, Stephen Gill, says. “The company is looking forward to continuing its support of Boeing 777 and 777X final assembly in Everett, Washington, and 787 final assembly in North Charleston, South Carolina. This contract extension continues our partnership with Boeing into the future for years to come.”
Related Content
-
Combining multifunctional thermoplastic composites, additive manufacturing for next-gen airframe structures
The DOMMINIO project combines AFP with 3D printed gyroid cores, embedded SHM sensors and smart materials for induction-driven disassembly of parts at end of life.
-
Infinite Composites: Type V tanks for space, hydrogen, automotive and more
After a decade of proving its linerless, weight-saving composite tanks with NASA and more than 30 aerospace companies, this CryoSphere pioneer is scaling for growth in commercial space and sustainable transportation on Earth.
-
First Airbus A350 crash confirmed in Haneda
Shortly after touch-down, a JAL A350-900 aircraft recently collided with a De Havilland Canada Dash 8. Exact circumstances are still unknown.