Boeing 777X debut may face delays
Recent news reports have said that this week’s debut of the Boeing 777X jetliner has been postponed.
According to recent news reports and FlightGlobal, the debut flight test of the Boeing 777X jetliner has been postponed after the crash of a Boeing 737 MAX 8 passenger aircraft operated by Ethiopian Airlines on March 10.
Boeing that the 777X would debut on Wednesday, March 13. The company has not officially announced a reschedule of the launch.
The 777X, called by Boeing “the largest and most efficient twin-engine jet in the world,” features all-carbon fiber composite wings, as covered previously by CW when Boeing began production of the aircraft.
Related Content
-
Plant tour: Collins Aerospace, Riverside, Calif., U.S. and Almere, Netherlands
Composite Tier 1’s long history, acquisition of stamped parts pioneer Dutch Thermoplastic Components, advances roadmap for growth in thermoplastic composite parts.
-
Combining multifunctional thermoplastic composites, additive manufacturing for next-gen airframe structures
The DOMMINIO project combines AFP with 3D printed gyroid cores, embedded SHM sensors and smart materials for induction-driven disassembly of parts at end of life.
-
Plant tour: Airbus, Illescas, Spain
Airbus’ Illescas facility, featuring highly automated composites processes for the A350 lower wing cover and one-piece Section 19 fuselage barrels, works toward production ramp-ups and next-generation aircraft.