Vestas wins 409 MW order in Brazil
The contract includes the supply and commissioning of V150-4.2 MW wind turbines, as well as a 20-year Active Output Management 5000 (AOM 5000) service agreements.

Photo Credit: Vestas
Vestas (Aarhus, Denmark) reported on August 28 that it has received a 409-megawatt (MW) order from the joint venture between Brazilian energy company Votorantim Energia (São Paulo, Brazil) and the Canadian fund CPP Investments for the projects Ventos do Piauí II and Ventos do Piauí III, in Serra do Inácio (Piauí, Brazil).
Vestas says the contract includes the supply and commissioning of V150-4.2 MW wind turbines, as well as a 20-year Active Output Management 5000 (AOM 5000) service agreements, designed to ensure optimized performance for the lifetime of the project.
Recently, Vestas announced it had surpassed 10 gigiwatts (GW) in firm order intake of V150-4.2 MW turbines globally. With this order, Vestas says it has secured almost 3.5 GW of orders for the turbine variant in Brazil, underlining the V150-4.2 MW’s fit with the country’s wind conditions.
Turbine delivery will begin in the second half of 2021 with commissioning scheduled for 2022.
Related Content
-
Achieving composites innovation through collaboration
Stephen Heinz, vice president of R&I for Syensqo delivered an inspirational keynote at SAMPE 2024, highlighting the significant role of composite materials in emerging technologies and encouraging broader collaboration within the manufacturing community.
-
High-tension, vertical filament winding enables affordable flywheel energy storage system
French startup Energiestro’s prototype solar energy flywheel-based storage system aims to reduce costs with glass fiber composites and prestressed concrete.
-
Plant tour: Hexagon Purus, Kassel, Germany
Fully automated, Industry 4.0 line for hydrogen pressure vessels advances efficiency and versatility in small footprint for next-gen, sustainable composites production.