Dura Composites GRP grating installed at Shepperton Marina
Middlesex-based marina’s novel 26-berth concept now comprises the anti-slip mini-mesh composite grating, with a complete pontoon decking replacement program in the works.
Share
Read Next
The Shepperton Marina with Dura Composites composite grating installed. Photo Credit: Dura Composites
’ (Essex, U.K.) anti-slip, mini-mesh glass-reinforced polymer (GRP) grating has been successfully installed at the Shepperton Marina, by (Fareham, U.K.). Based in Middlesex, the marine is placed as a base for both upper and lower Thames cruising and was recently shortlisted for the TYHA UK Inland Marina of the Year Awards. Open seven days a week, the marina provides a range of secure moorings with electricity and water, as well as large servicing and repair workshops.
In Aug. 2021, Shepperton opened its new berthing concept, known as “The Island.” The addition to Basin D features 26 new berths, accommodating vessels from 10-14 meters, set amongst a large circular pontoon area featuring Dura Composites’ Dura Grating Mini-Mesh product in the color Sand.
Supplied to Walcon Marine, is said to be the safest, strongest, fastest and most proven grating on the market. The composite grating is strong, durable and the anti-slip surface is tested to withstand even the wettest, oiliest and iciest conditions, Dura Composites contends, thus ensuring a safe and highly durable walkway that enables marina access throughout the year.
Dura Grating products are available in a range of thicknesses and mesh sizes (many with a Class B fire rating). They are easy to handle and require little to no maintenance over the course of their life cycle, ensuring a non-corrosive surface that comes with a 25-year warranty.
“We chose the composite Dura Grating for this project for a number of reasons, mainly the safety, low maintenance and aesthetic aspects,” Lisa Harris of Shepperton Marine says. “During the colder months when pontoons can become icy or slippery, the composite grating surface remains safe for our staff and customers to walk on. In my opinion, from a health and safety point of view, you can’t beat it!
“Thanks to the the successful installation of our new ‘Island Berths,’ we have now established a complete pontoon decking replacement program where we will replace timber with GRP Dura Grating,” Harris continues. “And which we expect to be completed in the next couple of years.”
Related Content
-
Plant tour: Collins Aerospace, Riverside, Calif., U.S. and Almere, Netherlands
Composite Tier 1’s long history, acquisition of stamped parts pioneer Dutch Thermoplastic Components, advances roadmap for growth in thermoplastic composite parts.
-
JEC World 2024 highlights: Thermoplastic composites, CMC and novel processes
CW senior technical editor Ginger Gardiner discusses some of the developments and demonstrators shown at the industry’s largest composites exhibition and conference.
-
Hybrid process marries continuous, discontinuous composites design
9T Labs and Purdue applied Additive Fusion Technology to engineer a performance- and cost-competitive aircraft bin pin bracket made from compression-molded continuous and discontinuous CFRTP.