Search Results
Showing 1 – 10 of 77 results
Since its start in a small barn, Bedford has grown into 200,000 square feet of manufacturing and fabrication space at two facilities, with an extensive GFRP product line.
GFRP ReadyLadder joins Bedford Reinforced Plastics’ NSF-certified product portfolio, meeting stringent water contact standards.
Adding GFRP ReadySeries to OSCO’s suite of safety solutions provides customers with a one-stop shop experience to address critical safety needs.
Formulated compound protects against UV degradation, the potential for fiber bloom as well as harsh weather exposure while strengthening the structure’s durability and performance.
Take a look at this month’s new hires, promotions and company developments from Daher, Carbon ThreeSixty, Collins Aerospace, Toray Advanced Composites, Syensqo, Zoltek, Technical Fibre Products, Bedford and Mito.
Pre-engineered and prefabricated structures such as catwalks, walkways, fixed ladders and more can be combined for flexible configuration and minimal ongoing maintenance.
LiteSIP panels and modules enable framing in days, cutting structural labor and total cost by up to 70% and 30%, respectively, while increasing energy efficiency and durability.
Noncontact calibration thickness gauges are engineered to ensure composites manufacturers can maintain tight control over product thickness and material uniformity.
Pre-engineered ReadySpan system for trail, park and golf bridges designed for easy installation and to perform in harsh environments for 75+ years with little maintenance.
LC3 project with Cranfield University and EV material development program with Raeon aim to develop a CMC supply chain in the U.K.