Gurit extends existing wind core kit supply contract
Three-year contract to generate business for all ten Gurit kitting sites, including new facilities.

Photo Credit: Getty Images
On March 1, Gurit (Zurich, Switzerland) announced a three-year core material kit engineering and supply contract with a major wind turbine manufacturer. The agreement is a continuation of a long-standing partnership with similar volumes and is expected to generate net sales of CHF 270-350 million (approximately USD $290-377 million) over the 2021-2023 period. The contract will generate business for all ten kitting sites, including the new facilities being set up in India. Gurit Kitting will provide additional benefits with the reduction of the Total Cost of Ownership for the customer through innovative design solutions.
“The extension of our existing partnership is the result of our team’s ability to deliver consistent high quality and builds on our global footprint and focus on innovative engineered core kits,” says Andreas Kipker, general manager of Gurit’s Kitting business unit.
Related Content
-
High-tension, vertical filament winding enables affordable flywheel energy storage system
French startup Energiestro’s prototype solar energy flywheel-based storage system aims to reduce costs with glass fiber composites and prestressed concrete.
-
Composites end markets: Batteries and fuel cells (2024)
As the number of battery and fuel cell electric vehicles (EVs) grows, so do the opportunities for composites in battery enclosures and components for fuel cells.
-
Polar Technology develops innovative solutions for hydrogen storage
Conformable “Hydrogen in a Box” prototype for compressed gas storage has been tested to 350 and 700 bar, liquid hydrogen storage is being evaluated.