ÂÌñÏׯÞ

Published

What's old is new again

Happy New Year. As it does for many of you, the December-to-January jump heralds for us at HPC a renewal of sorts as we delve into a fresh collection of stories and welcome some new contributing writers. Among the new names you’ll see in our bylines, one that might be familiar is Chris Red. The editor and VP of market

Share

Happy New Year. As it does for many of you, the December-to-January jump heralds for us at HPC a renewal of sorts as we delve into a fresh collection of stories and welcome some new contributing writers. Among the new names you’ll see in our bylines, one that might be familiar is Chris Red. The editor and VP of market research at Composite Market Reports (Gilbert, Ariz.), Chris has been involved in the composites industry for many years and is a highly respected and familiar face at industry conferences and seminars around the world. His specialty, market and technology analysis, becomes a strength for HPC in 2008. Chris will write a series of “Market Outlook” features, covering sports equipment this month (see “Market Outlook” under “Related Content,” at left), and in subsequent months he will explore advanced composites use in rotorcraft, business and experimental aircraft, commercial aircraft and jet engines.

Boeing uncertainty, carbon fiber’s future

Just before the close of 2007, The Boeing Co. hosted one of its quarterly conference calls/Webcasts to provide an update on the status of the 787 Dreamliner. As you know, after what had been an apparently smooth-running, glitch-free production process for the 787, Boeing announced in mid-October that the first 787 was not coming together as planned, would not make its first flight in the fall as planned and would not be delivered to All Nippon Airways in May 2008 as planned. Further, Mike Bair, manager of the 787 program, was unseated and replaced by Boeing veteran Pat Shanahan. Along, then, came the mid-December conference call, ahead of which there was some speculation in the aerospace industry that Boeing would announce further 787 delays. What we heard, however, was a steadfast declaration by Shanahan and Boeing executive VP Scott Carson that the Dreamliner would, indeed, power up in January, fly by March, and land in All Nippon’s inbox before the end of 2008.

Questions during this conference call came from a variety of high-profile types, including investment bankers and mass media journalists, and nearly all betrayed some skepticism that Boeing could meet the new schedule. Further concern seemed to revolve around two additional factors: Boeing has planned, and continues to plan, to build 109 787s in 2009 — nine planes a month — followed by a ramp-up to an eye-popping 14 planes a month in 2010. All of this is necessary so that Boeing can start nibbling away at the 761 Dreamliner orders now on its books.

Plans like this have a ripple effect throughout the composites industry: Toray is in talks with Boeing to extend its carbon fiber supply contract for the 787 to meet the 2010 demand, which means that Toray would have to expand facilities and add capacity at plants in Washington State, Alabama and Japan, which means that the closely watched carbon fiber supply/demand equation very likely will change … again.

The early ripples were felt in Washington, D.C. as well, at COMPOSITESWORLD’s Carbon Fiber 2007 Conference (Dec. 5-7, 2007; see “Carbon Fiber 2007 ….” under “Related Content”). The question before conference attendees was deceptively simple: Given the spate of recent announcements of carbon fiber production expansions, will there be enough to go around in the next decade? There was no consensus. Some looked at data presented at the conference and saw supply exceeding demand consistently. Doubters, citing pent-up demand caused by the shortage, declared that there will never be enough carbon fiber to meet every market’s need. The truth is no one can know for sure. Welcome to 2008.

microwire technology for composites

Related Content

Focus on Design

Next-generation airship design enabled by modern composites

LTA Research’s proof-of-concept Pathfinder 1 modernizes a fully rigid airship design with a largely carbon fiber composite frame. R&D has already begun on higher volume, more automated manufacturing for the future.

Read More

Automated robotic NDT enhances capabilities for composites

Kineco Kaman Composites India uses a bespoke Fill Accubot ultrasonic testing system to boost inspection efficiency and productivity.

Read More
Autoclave

Plant tour: Spirit AeroSystems, Belfast, Northern Ireland, U.K.

Purpose-built facility employs resin transfer infusion (RTI) and assembly technology to manufacture today’s composite A220 wings, and prepares for future new programs and production ramp-ups.

Read More
Carbon Fibers

The potential for thermoplastic composite nacelles

Collins Aerospace draws on global team, decades of experience to demonstrate large, curved AFP and welded structures for the next generation of aircraft.

Read More

Read Next

Aerospace

Assembling the Multifunctional Fuselage Demonstrator: The final welds

Building the all-thermoplastic composite fuselage demonstrator comes to an end with continuous ultrasonic welding of the RH longitudinal fuselage joint and resistance welding for coupling of the fuselage frames across the upper and lower halves.  

Read More
Hi-Temp Resins

“Structured air” TPS safeguards composite structures

Powered by an 85% air/15% pure polyimide aerogel, Blueshift’s novel material system protects structures during transient thermal events from -200°C to beyond 2400°C for rockets, battery boxes and more.

Read More
ATL/AFP

Composites end markets: New space (2025)

Composite materials — with their unmatched strength-to-weight ratio, durability in extreme environments and design versatility — are at the heart of innovations in satellites, propulsion systems and lunar exploration vehicles, propelling the space economy toward a $1.8 trillion future.

Read More